Usetech Ltd v Young (2004) – why substitution must work across the contract chain

Usetech Ltd v Young [2004] EWHC 2248 (Ch) is an important early IR35 case about substitution and the contractual chain.

William Hood supplied specialist engineering design services through Usetech Ltd. His company contracted with agency NES, which supplied him to oil and gas engineering company ABB Vetco Gray (UK) Ltd.

Usetech’s contract with NES contained a substitution clause.

The contract between NES and ABB did not.

That difference became central to the case.

The problem for Usetech was the contractual chain. The PSC–agency contract said Hood could provide a substitute, but there was no equivalent right in the agency–client contract. The High Court concluded that a direct contract between Hood and ABB would not have contained a substitution right.

William Hood’s ABB engagement

Hood was a specialist in producing engineering design drawings for oil wells and rigs using a 3D modelling package called Pro-Engineer.

Usetech supplied his services to ABB through NES from June 2000.

The engagement was initially expected to be short, but Hood remained at ABB for around 17 months.

ABB employed hundreds of permanent staff and also used contractors supplied through agencies. Contractors were interviewed by ABB before they were accepted.

Hood worked alongside ABB staff and was allocated work according to the company’s requirements.

Because of his technical experience, he did not need to be told how to perform the specialist work itself.

The first decision

Usetech appealed HMRC’s IR35 decision to Special Commissioner Colin Bishopp.

Bishopp found against the company.

He considered the hypothetical direct contract between Hood and ABB and concluded that it would have been a contract of service.

Usetech then appealed to the High Court.

The High Court appeal was much narrower. It concentrated on two points: substitution and mutuality of obligation.

The substitution clause

The contract between Usetech and NES contained a standard substitution provision.

It allowed Usetech to provide an alternative worker with ABB’s prior written consent.

But the contract one level higher up the chain, between NES and ABB, contained no corresponding substitution right.

Evidence from ABB was also important.

ABB had engaged Hood because it wanted his services. If he had become unavailable, the company might have considered somebody he recommended, but that person would have been interviewed and engaged under a new arrangement.

That was not the same thing as Hood having a contractual right to send somebody else in his place.

What Park J decided

Mr Justice Park said there was a more basic question than whether the substitution clause in the Usetech–NES contract was genuine or useful.

Would the hypothetical direct contract between Hood and ABB have contained a substitution clause at all?

He concluded that it would not.

There was no substitution provision in the ABB–NES contract, and no evidence that Usetech had tried to secure one at that level.

The evidence also showed that ABB wanted Hood himself.

Park J therefore rejected Usetech’s substitution argument.

This is why Usetech is still useful when reviewing contractor supply chains. A favourable clause in the PSC–agency contract tells only part of the story.

See our guide to the right to provide a substitute.

A replacement is not always a substitute

The case also drew a useful distinction between providing a substitute and simply suggesting another person who might take over the work.

ABB said it would have taken Hood’s recommendation seriously if he became unavailable.

But the replacement would still have needed ABB’s approval and would have been engaged under a new contract.

Hood would not have remained responsible for supplying the replacement through Usetech.

That is very different from a contractor exercising a contractual right to provide another suitably qualified person to perform the existing engagement.

Mutuality of obligation

Usetech also argued that there was insufficient mutuality of obligation.

The ABB–NES contract required ABB to provide and pay for at least 37.5 hours of work.

The arrangement was also subject to a seven-day notice period.

Park J concluded that the hypothetical direct contract between ABB and Hood would have contained equivalent obligations.

The mutuality argument therefore failed as well.

Later cases, particularly PGMOL, now provide the more important modern authority on mutuality. Usetech remains useful for showing how contractual obligations in the supply chain can feed into the hypothetical contract.

Hood’s wider business

Hood had carried out some work for two other companies during the ABB engagement.

Those jobs were done in the evenings and at weekends and each generated fees of around £800.

The Special Commissioner did not regard that limited outside work as enough to change the character of the ABB engagement.

A contractor can be in business generally and still have a particular engagement which amounts to employment for IR35 purposes.

See business on own account.

Control at ABB

Hood was highly skilled, so ABB did not need to tell him how to use Pro-Engineer or how to carry out his specialist technical work.

It still controlled the work at a broader level.

Work was allocated at weekly meetings and Hood worked on whatever ABB’s business required at the time.

Permanent and temporary staff were normally expected to work from 8am to 5pm, and Hood was expected to discuss holidays and time off with his manager.

The fact that ABB did not supervise his technical methods did not mean that control was absent.

See control and IR35.

Why Usetech lost

The substitution argument was Usetech’s main difficulty on appeal.

The company relied on wording in its own contract with NES, but the evidence further up the supply chain pointed the other way.

ABB had engaged Hood personally. The ABB–NES contract contained no substitution right, and a replacement would have required a fresh decision by ABB.

The mutuality argument also failed because the contractual arrangements provided for minimum paid hours and a notice period.

Park J dismissed the appeal.

Why the case still matters

Usetech is particularly useful where a contractor works through an agency.

A substitution clause in the PSC’s contract should not be reviewed in isolation. The client contract and the evidence from the client may point to a different arrangement.

That became important again in Dragonfly Consultancy Ltd v HMRC, where the contracts at different levels of the chain also had to be reconciled when constructing the hypothetical agreement.

Usetech is therefore less about whether a substitution clause has actually been exercised and more about a prior question: would that right exist in the hypothetical direct contract with the client?

Judgment

The High Court judgment was given by Mr Justice Park on 8 October 2004.

HMRC Employment Status Manual – Usetech Ltd v Young (ESM7270)

Usetech Ltd v Young [2004] EWHC 2248 (Ch) – High Court judgment